720-851-9765
Your Subtitle text

PVB Pre-Winterize

We Offer:
  • Weekend & Late Appointments
     
  • Senior Discounts
     
  • Warrantied Work
     
  • Financing Available
     
  • High integrity work




High Integrity, Efficient Repairs

System Service
&
Repair

&
System
Upgrades
 

 

We Use Only the HIGHEST Quality Products!
Pre-Winterization Steps



#1 Shut off Water at Main Supply Valve

#2 Turn all 4 Valves on the unit shown here to a 45 degree Angle (not 90 degrees)

#3 Open all applicable drains (Valve Box, Shut-Off Valve, Mainline, etc.)

#4 Turn off timer (Controller)




Every year, before the first freeze, you’ll want to have your system "blown out" or “winterized”. This is the process of forcing compressed air through the entire system to make it free of water and relatively safe against freeze damage.

The above diagram will assist you in taking some preventative steps if you have the above ground copper backflow unit such as the one above. These are preliminary steps that can prepare your system for the compressor to blow out the rest of the water. The copper units above ground are the most susceptible to early freezes – so this is an option while you are waiting for your scheduled blowout.

Also, this preparation may give you the flexibility to not have to be home when the technician comes with the compressor. Just let your scheduler know if you’ve completed these steps yourself. We look forward to serving you.
Website Builder